Page 1
Page 1
Started By
Message

re: Power back on estimate BR area are in.

Posted on 5/14/24 at 8:44 am to
Posted by tigeraddict
Baton Rouge
Member since Mar 2007
11835 posts
Posted on 5/14/24 at 8:44 am to
You can only pull so far before the wire would try to stretch. You need a manhole every so often and possibly sectionalizers for when you splice sections if regular splices are not allowed.

Conduit can be bored to keep it deep but you have to come back up to hit the manholes.

Seen 13.8kV and 4160v require 300’ between manholes
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram