- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: LADOTD announced closures for I-10 expansion and lake project starting November 27
Posted on 11/20/23 at 11:19 pm to BilbeauTBaggins
Posted on 11/20/23 at 11:19 pm to BilbeauTBaggins
quote:
At least they had the decency to start after football season.
Construction was delayed until after the election. Someone thought Pothole Wilson would be in the run-off for governor and didn't want the voters to associate him with the expanded SNAFU that is Baton Rouge I-10 traffic.
Posted on 11/21/23 at 6:59 am to FlyingPelican
quote:
Construction was delayed until after the election.
Construction has been ongoing for months. It's been on the news and you can see where they have started on the new bridge.
Posted on 11/21/23 at 7:48 am to ksdolfan
quote:
But, but, the I10 Miss river bridge is still just two lanes in each direction. They’re just making the bottle that much bigger than the neck!
The actual bridge is six lanes. The approaches funnel down to two lanes.
Posted on 11/21/23 at 8:15 am to dkreller
quote:
I wish Louisiana could subcontract this shite out to the state of Texas.
I-10 through orange says “Suh dude”
Posted on 11/22/23 at 8:36 pm to lostinbr
quote:When does all of that start?
It was originally going to be one lane WB from the 10/110 split to the bridge, and one lane EB from the bridge to the Washington St exit.
They then decided to widen the WB flyover before closing any lanes, which will allow it to stay at two lanes WB from the 10/110 split to the bridge. It will still be one lane on the EB side from the bridge to Washington St, but it already bottlenecks at that exit anyway since the right lane is exit only.
Posted on 11/22/23 at 8:48 pm to BilbeauTBaggins
Les Miles has lost control of the LADOTD.
I’ve seen like 10 better looking critical paths on the Quad today.
I’ve seen like 10 better looking critical paths on the Quad today.
Popular
Back to top
Follow TigerDroppings for LSU Football News