Started By
Message

re: I hope they aren’t planning on keeping the new Nicholson exit off the bridge the way it is

Posted on 2/19/24 at 10:02 am to
Posted by loogaroo
Welsh
Member since Dec 2005
31057 posts
Posted on 2/19/24 at 10:02 am to
quote:

I take that exit every single work day and that is not what is causing backups. Sure, every once in a while it would be backed up on the ramp but that was the exception. The bridge is backed up because of going down to one lane and everyone knows it.


I'm not saying it's causing the bridge to back up...yet.

We all know what that problem is. I'm saying this is going to make it worse. Nicholson exit lane used to flow decently until this new design.

Now you have an added light to Nicholson that completely stops the flow off the bridge.
This post was edited on 2/19/24 at 10:07 am
Posted by whoa
New Orleans
Member since Sep 2017
4624 posts
Posted on 2/19/24 at 10:18 am to
They literally just extended the exit a block down, it’s the exact same thing as before except the exit now has the capacity to hold more vehicles coming off the bridge.

The light is brand new, im sure it’ll take them a few tries to get the synchronization right.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram