- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Setting a 4x4 fence post in concrete on top of 2" schedule 40 pvc pipe
Posted on 3/20/22 at 8:32 pm to Tigers35
Posted on 3/20/22 at 8:32 pm to Tigers35
quote:
Do you have room to reroute the pipes? It’ll be more work, but it may solve your problem.
Technically, yes. But I'd have to pump pool water down 3' or so to drop level below those pipes so I can cut into them. There's also 5 that I'd have to reroute. I'm not worried about having to get to the pipes later if needed. I'm fine just digging up the post. My concern is how much dirt do I need to have between pipes and bottom of concrete. I don't want to break the pipes. Thanks
This post was edited on 3/20/22 at 8:38 pm
Popular
Back to top
Follow TigerDroppings for LSU Football News