Started By
Message

re: Dear Baton Rouge Folk, Your Traffic Sucks arse

Posted on 4/25/24 at 5:16 am to
Posted by cssamerican
Member since Mar 2011
7135 posts
Posted on 4/25/24 at 5:16 am to
quote:

Good news is, this will all be MUCH better when the loop is completed and open in Q3 of 2025. It’ll be more enjoyable visiting then.

Just wait till we tear down the elevated eastbound side of I-10 from Acadian to the I-110 interchange this summer, I’m going to need a helicopter to go to work for the remainder of my life.
This post was edited on 4/25/24 at 5:35 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram