Started By
Message

re: Cancellation of Mid-Barataria Diversion project could cost Louisiana at least $700 million

Posted on 5/10/24 at 4:25 pm to
Posted by KamaCausey_LSU
Member since Apr 2013
14583 posts
Posted on 5/10/24 at 4:25 pm to
quote:

I’ve been studying this for over 30 years and have forgotten more than you actually know.

Same could be said for the engineers and scientists that have designed the diversion project.
Posted by Marshhen
Port Eads
Member since Nov 2018
673 posts
Posted on 5/10/24 at 4:54 pm to
quote:

Same could be said for the engineers and scientists that have designed the diversion project.


Absolutely. They hired some of the best engineers and scientists. I think much of the work is done well; however, it doesn’t change the fact that the price has skyrocketed past the point of making sense.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram