Page 1
Page 1
Started By
Message

re: Cancellation of Mid-Barataria Diversion project could cost Louisiana at least $700 million

Posted on 5/10/24 at 3:14 pm to
Posted by Marshhen
Port Eads
Member since Nov 2018
674 posts
Posted on 5/10/24 at 3:14 pm to
quote:

Maybe 50k/acre is a pure line item in a bid tab on $/CY basis, but once you add in all of the entirely necessary ancillary line items like the permitting and land rights and geotech and surveying it is never 50k/acre except in the smallest of projects


Just an FYI, since you think you are an expert, it gets much cheaper (per CY or acre) the bigger your project gets.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram