re: Cancellation of Mid-Barataria Diversion project could cost Louisiana at least $700 million

Posted on 5/10/24 at 1:56 pm to
Posted by Marshhen
Port Eads
Member since Nov 2018
673 posts
Posted on 5/10/24 at 1:56 pm to
quote:

The key with the diversions is to rebuild land over time, year after year. After the initial major expense of building a structure that mimics the old river flooding, there is minor costs associated with maintenance unlike the yearly costs associated with dredging.


I have heard this same thing regurgitated as well. But it’s simply not as accurate as you make it seem. Because the State assumed that the structure will last forever. It won’t. It will have to be replaced eventually. Actually, the structure requires annual maintenance costs … dredging doesn’t. Dredging will require future lifts in 20, 30, 50 years.
Posted by BugAC
St. George
Member since Oct 2007
52945 posts
Posted on 5/10/24 at 2:02 pm to
quote:

Dredging will require future lifts in 20, 30, 50 years.


Or, after 1 big hurricane.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram